Bakerville to Loveland

Screen Shot 2018-03-23 at 11.07.59 AM.png
Screen Shot 2018-03-23 at 11.08.19 AM.png
Screen Shot 2018-03-23 at 11.08.51 AM.png

These images are from the 2005 Clear Creek Greenway Master Plan and will be updated soon.

This section of trail has been installed, including bridges.  However, it is currently a soft surface trail that will need to be upgraded to meet the Greenway Design Standard.